Know what is moving, waiting and ready.

Track work in progress, bins and finished goods through production without adding another register or scanning every item by hand.

Spur

Production record

Job
JW-204
Bin
BIN-018
Current stage
Assembly
Next stage
Final inspection
Location and stage recorded

Example data

From production start to finished goods

  1. 1

    Identify the item, bin or job

    Apply the right RFID label at the point your team already issues or packs the work.

    Spur

    Job issue · JW-204

    Job
    JW-204
    Bin
    BIN-018
    Items
    24
    Issued to
    Line 2
    Job and bin linked

    Example data

  2. 2

    Read each production handoff

    Record movement between stages so the current location and status stay attached to the same job.

    Spur

    Stage handoff · Line 2

    From
    Machining
    To
    Assembly
    Bin
    BIN-018
    Read at
    11:42
    Handoff recorded

    Example data

  3. 3

    Find waiting work quickly

    Use the handheld to locate a bin or check what is still waiting at a stage.

    Spur

    Locate · BIN-018

    Last stage
    Assembly
    Location
    Line 2 · Bay 3
    Status
    Waiting for inspection
    Handheld
    Item located
    Bin found

    Example data

  4. 4

    Check finished goods before dispatch

    Match tagged finished goods to the order and keep the production and dispatch history together.

    Spur

    Finished goods · SO-4521

    Job
    JW-204
    Order
    SO-4521
    Expected
    24
    Read
    24
    Ready for dispatch

    Example data

What changes, what stays the same

TaskStays the sameWith Spur
Job identityYour existing job and item codesRFID links the physical bin to that record
Production stagesYour team and routingReads record each handoff
Work in progressSupervisors resolve exceptionsCurrent stage and location stay visible
DispatchSame orders and loading flowFinished goods checked before loading

Example scenario

Manufacturing and automation

The problem

A multi-stage plant uses bins to move work between machines. Supervisors spend time finding jobs and reconciling the traveller with what is physically waiting.

How Spur handles it

  1. 1

    RFID links the bin to its job and item record.

  2. 2

    Reads at handoffs record the current stage and location.

  3. 3

    Finished goods are checked against the dispatch order.

What we measure in your 30-day trial

  • Time to locate a job or bin
  • Bins matched to the right job
  • Time to count finished goods
  • Dispatch mismatches caught

These are the measures we report at the end of your trial. They are example measures, not customer results.

Next phases

After the first rollout, choose the next area with your team.

2

More lines and read points

Extend the same job record to another line or production stage.

3

Job workers and subcontracting

Bring outward and return movement into the same item history.

Discuss your next phase

A careful start

See it on your own stock.

No broad rollout on day one. Start with one useful workflow, agree what to measure and review the result with your team.

  1. 01

    Walk the work together

    A free one-hour site visit. We look at the items, movement points and records that matter. Pricing is shared after the visit.

  2. 02

    Run a 30-day trial

    We agree one useful scope and set up on your real stock. Your team uses Spur in its normal working day.

  3. 03

    Review the evidence

    We report the agreed exception checks and time measures. Then you decide what to roll out next.

WhatsApp Book a visit