Know what is moving, waiting and ready.
Track work in progress, bins and finished goods through production without adding another register or scanning every item by hand.
Production record
- Job
- JW-204
- Bin
- BIN-018
- Current stage
- Assembly
- Next stage
- Final inspection
Example data
From production start to finished goods
- 1
Identify the item, bin or job
Apply the right RFID label at the point your team already issues or packs the work.
SpurJob issue · JW-204
- Job
- JW-204
- Bin
- BIN-018
- Items
- 24
- Issued to
- Line 2
Job and bin linkedExample data
- 2
Read each production handoff
Record movement between stages so the current location and status stay attached to the same job.
SpurStage handoff · Line 2
- From
- Machining
- To
- Assembly
- Bin
- BIN-018
- Read at
- 11:42
Handoff recordedExample data
- 3
Find waiting work quickly
Use the handheld to locate a bin or check what is still waiting at a stage.
SpurLocate · BIN-018
- Last stage
- Assembly
- Location
- Line 2 · Bay 3
- Status
- Waiting for inspection
- Handheld
- Item located
Bin foundExample data
- 4
Check finished goods before dispatch
Match tagged finished goods to the order and keep the production and dispatch history together.
SpurFinished goods · SO-4521
- Job
- JW-204
- Order
- SO-4521
- Expected
- 24
- Read
- 24
Ready for dispatchExample data
What changes, what stays the same
| Task | Stays the same | With Spur |
|---|---|---|
| Job identity | Your existing job and item codes | RFID links the physical bin to that record |
| Production stages | Your team and routing | Reads record each handoff |
| Work in progress | Supervisors resolve exceptions | Current stage and location stay visible |
| Dispatch | Same orders and loading flow | Finished goods checked before loading |
Example scenario
Manufacturing and automation
The problem
A multi-stage plant uses bins to move work between machines. Supervisors spend time finding jobs and reconciling the traveller with what is physically waiting.
How Spur handles it
- 1
RFID links the bin to its job and item record.
- 2
Reads at handoffs record the current stage and location.
- 3
Finished goods are checked against the dispatch order.
What we measure in your 30-day trial
- Time to locate a job or bin
- Bins matched to the right job
- Time to count finished goods
- Dispatch mismatches caught
These are the measures we report at the end of your trial. They are example measures, not customer results.
Next phases
After the first rollout, choose the next area with your team.
More lines and read points
Extend the same job record to another line or production stage.
Job workers and subcontracting
Bring outward and return movement into the same item history.
A careful start
See it on your own stock.
No broad rollout on day one. Start with one useful workflow, agree what to measure and review the result with your team.
- 01
Walk the work together
A free one-hour site visit. We look at the items, movement points and records that matter. Pricing is shared after the visit.
- 02
Run a 30-day trial
We agree one useful scope and set up on your real stock. Your team uses Spur in its normal working day.
- 03
Review the evidence
We report the agreed exception checks and time measures. Then you decide what to roll out next.