Stop wrong dispatches before the truck leaves.
A fixed RFID gate at your dispatch door reads every carton on the trolley at once and checks it against the order, in seconds.
Example data
30 / 30 verified
The trolley never stops being pushed. The gate does the checking.
Step by step
How it works
- 1
Load the order on a trolley as usual.
- 2
Push it through the gate. Every tagged carton is read at once, without scanning.
- 3
Spur checks each carton against the order: product, batch, quantity, QC status.
- 4
Green means dispatch. Red names the exact carton to fix.
- 5
The dispatch is confirmed in your ERP automatically.
A useful next step
Check your dispatch setup.
Show us the door, trolley or conveyor and the order your team uses. We will suggest what to test in a 30-day trial.
What it catches
| Wrong carton | C-14 missing, B-17 in its place | |
| Wrong batch for the customer | Order needs B2611, trolley has B2598 | |
| QC-hold stock leaving the plant | CTN-00907 is on QC hold | |
| Short or extra cartons | Order is 30, trolley has 29 |
What the gate screen shows
One screen at the door. Anyone on the shift can read it.
Ready
Waiting for the next trolley.
Example data
Ready
Scanning
18 of 30 detected
Example data
Scanning — 18 of 30 detected
30 / 30
Gate green. Load the truck.
Example data
Verified — 30 / 30
Wrong carton
C-14 missing · B-17 in its place
Example data
Wrong carton
Setup
Reader and antennas at your dispatch door, a tower light and a screen. Works with trolleys, pallets or conveyors. We size it after the site visit.
A careful start
See it on your own stock.
No broad rollout on day one. Start with one useful workflow, agree what to measure and review the result with your team.
- 01
Walk the work together
A free one-hour site visit. We look at the items, movement points and records that matter. Pricing is shared after the visit.
- 02
Run a 30-day trial
We agree one useful scope and set up on your real stock. Your team uses Spur in its normal working day.
- 03
Review the evidence
We report the agreed exception checks and time measures. Then you decide what to roll out next.